Nantucket Maria Mitchell Association to Host Annual Aquarium Release Day

Sep 15, 2023

Nantucket, MA – The Nantucket Maria Mitchell Association (MMA) announces that its annual Aquarium Release Day will take place on Saturday, Oct. 7, 2023 from 10am - 12pm at the MMA Aquarium, 28 Washington Street. Join MMA staff for refreshments, face painting, and games as you help the staff release this season’s Aquarium inhabitants back into the ocean. This event is FREE to the public and a great opportunity to learn and celebrate the marine life that live in the waters of Nantucket Island.


The MMA Aquarium is dedicated to educating the public on the importance of biodiversity in our unique marine ecosystems found here on Nantucket. Each summer, the MMA Aquarium Director, Jack Dubinsky, as well as his team of dedicated college interns and volunteers, explore the shores of Nantucket and find and document an assortment of over 7,500 individual marine animals, most of which are recorded and released. They snorkel, seine, and beachcomb to collect over 300 different marine animals. These animals are studied and cared for so that the MMA can help people to learn more about these important marine organisms while they are featured at the popular Washington Street aquarium throughout the season. These marine animals represent roughly seventy different species collected by the MMA staff in tandem with local fishermen.


Pre-registration is encouraged. Register at the link below:

112458a.blackbaudhosting.com/112458a/2023-Aquarium-Release-Day


The Maria Mitchell Association is a private non-profit organization. Founded in 1902, the MMA works to preserve the legacy of Nantucket native astronomer, naturalist, librarian, and educator, Maria Mitchell. The Maria Mitchell Association operates two observatories, a natural science museum, an aquarium, a research center, and preserves the historic birthplace of Maria Mitchell. A wide variety of science and history-related programming is offered throughout the year for people of all ages.


                                    ### 

For Immediate Release

September 15, 2023

Contact: Molly Mosscrop

mmosscrop@mariamitchell.org

Recent Posts

08 May, 2024
“If you don’t look, you don’t see. You have to go and look.” -Edith Andrews
By Jascin N. Leonardo FInger 06 May, 2024
I have written of my love for sea glass and pottery shards in the past and the recent replacement of the sewer and water lines on Vestal Street created a small shard collection over the last month. Since the work required the asphalt to be completely removed (all twelve inches of it!) and the road to be dug up multiple times as they worked to remove pipe, relay new pipe, hook up the water meters, and install drainage and manhole covers, this resulted in the earth in the street being tossed about quite a bit. And, with that, came the shards! Some of these likely came from the sewer line (yes, yuck) but others came from being simply in the dirt of the road – which was not paved until 1946/1948. Pieces were likely tossed out at times, made to act as filler in holes, or simply tossed. So I found all sorts of pieces I will keep here at the Mitchell House. They included: a lovely piece with a red floral, many pieces of plates, glass, the top of a late nineteenth or early twentieth century (medicine) bottle, glass shards, a flattened spoon, a brass knob (found by a neighbor) some nails, a spike, pieces of a larger container or two based on the size and curve and coloring of the shards, and possibly a Wampanoag stone tool. One person’s trash is another one’s treasures! JNLF
22 Apr, 2024
Yes. Well, almost. After about a month of working – and some living (staff and or neighbors) – on Vestal Street with all the sewer and water replacement work, the paving happened today (April 17, 2024). This is the first “layer” – a three-inch binder coat. In the fall, once time has passed, they will return for the final one inch of the finish layer. Some of the other things along Vestal Street will also be repaired and updated between now and the final coat – and a bit after that. But we are very happy, after all these years to have a modern system of piping – and all new drainage we never had before! While the curator in me loved the old clay pipes, they were riddled with roots from the trees, holes, and in some places, collapsed, and the twelve inches of asphalt had to go. Vestal Street was only paved in about 1946/1948 – and has not been paved in maybe twenty years so that is a lot of asphalt in about fifty years! And with climate change and the increase in how much rain we get in these heavy rain events, all that water rushed down Vestal Street with nowhere to go – except our cellars. I am sure the neighbors are happy too! A thank you to the Town of Nantucket’s Sewer Department, especially David Gray (who may regret giving me his cellphone number forever), N&M Excavating and Utilities (Dean, we appreciate you being so nice when we had too many questions), Victor-Brandon Corp for paving, and numerous others. We are looking forward to great flushing, powerful hose lines, and rainwater being whisked away via the new, never-before-had storm drains! JNLF And to all the N&M workers who wondered why I was constantly looking down as I walked along Vestal Street, you should see the trove of porcelain shards, glass, old nails, a bottle neck, 19 th century spoon, and even possibly a Wampanoag stone tool I found!
Show More
Share by: