Is That A Wrap?
Yes. Well, almost. After about a month of working – and some living (staff and or neighbors) – on Vestal Street with all the sewer and water replacement work, the paving happened today (April 17, 2024). This is the first “layer” – a three-inch binder coat. In the fall, once time has passed, they will return for the final one inch of the finish layer. Some of the other things along Vestal Street will also be repaired and updated between now and the final coat – and a bit after that. But we are very happy, after all these years to have a modern system of piping – and all new drainage we never had before!
While the curator in me loved the old clay pipes, they were riddled with roots from the trees, holes, and in some places, collapsed, and the twelve inches of asphalt had to go. Vestal Street was only paved in about 1946/1948 – and has not been paved in maybe twenty years so that is a lot of asphalt in about fifty years! And with climate change and the increase in how much rain we get in these heavy rain events, all that water rushed down Vestal Street with nowhere to go – except our cellars. I am sure the neighbors are happy too!
A thank you to the Town of Nantucket’s Sewer Department, especially David Gray (who may regret giving me his cellphone number forever), N&M Excavating and Utilities (Dean, we appreciate you being so nice when we had too many questions), Victor-Brandon Corp for paving, and numerous others. We are looking forward to great flushing, powerful hose lines, and rainwater being whisked away via the new, never-before-had storm drains!
JNLF
And to all the N&M workers who wondered why I was constantly looking down as I walked along Vestal Street, you should see the trove of porcelain shards, glass, old nails, a bottle neck, 19th century spoon, and even possibly a Wampanoag stone tool I found!
Recent Posts