Crack repair in MMA Science Library Wing basement.

“Faux bois” concrete.

Work keeps progressing. Mason Wayne Morris told me that once he started, it would move quickly and he was not wrong, that’s for sure. They have made the repairs to the interior cracks in the basement of the Wing now. These cracks are probably due to the movement of the building soon after it was constructed and then in a few places, simply shrinkage caused by time. In the photographs here, you can see where they have filled the cracks with concrete – along the walls and where the walls meet the ceiling.

 

In one image you will notice a “faux bois” (false wood) effect to the poured concrete wall. This is on many sections of the concrete walls in the basement. What caused it? Well, the forms they made in the 1930s to pour the foundation were wood and once dry, when they pulled the wood out, beautiful wood graining was left behind. Some people would pay a lot of money to have this and in it’s on our cellar walls!


Morris also inspected the book stack supports in the cellar of the Wing which we believe are load bearing. He did this to check for rust per the structural engineer but I am happy to report they are rust free.


Now, he is back outside getting ready to replace the steel lintels at the top of the windows on the main floor. These have not had the water penetration that the basement windows have had but there is rust and thus, some cracking of the stucco. Then, he will have to make repairs to a small section on the east side where there has been some map cracking – large pattern cracking which is due to water penetration and follows the shape of the terracotta tiles below. So, in this case, the cracks form rectangles.


If you have not been up to Vestal Street to take a look, please do! We are moving along nicely on the exterior and hope to complete the plans for the interior and begin moving forward with that work. And again, a thank you to the Community Preservation Committee for the grant that has allowed us to do all of this exterior preservation work.


JNLF

Recent Posts

By Jascin N. Leonardo Finger April 13, 2026
April 1878. The conference of Woman’s Congress officers met in Washington. Because we had one member in Washington we were invited to meet in that place. I went on at a great expense of time, money and strength . . . . We were in session at least nine hours. I think that more than half of that was used by Mrs. Spencer and Mrs. Sayles. The only motion which I carried through was to pay the Secretary $200 . . . In 1878, that was a long train(s) ride to Washington, DC from Poughkeepsie, NY and Vassar College. If Maria seems perturbed, I am sure she was. As president of the Association for the Advancement of Women, and thus the Congress, she had to be at the meeting. But it appears she did not get much say in the nine hour meeting. This was also a long trip to take when she had another, even longer trip coming up in July of 1878. In that month, she would travel with students and her sister, Phebe, out west to Colorado to view the eclipse and that train and wagon ride I am sure was weighing on her mind – not just the physical trip but making her way for an important eclipse viewing event. JNLF
By Jascin N. Leonardo Finger April 6, 2026
Well, actually replace the roof! With funding from the Community Preservation Act and the work of Lydon and Sons, Inc. the Mitchell House is getting a new roof. The current one had come to the end of its useful life. A cedar roof can last a long time – longer than asphalt – and is more historically accurate. The roof we are removing was installed in about 1992 – replacing a roof from the 1930s that was not cedar but a combination of materials that actually yes, did last sixty years. The unfortunate issue has arisen that the roofwalk (walk) has to be replaced. This is NOT the original walk – nor that old of a walk. It’s likely from the 1970s or so and has been cobbled at over time. It’s not a functioning walk – no one is allowed on it – but the Mitchell House needs it none the less. Maria Mitchell and her father, William, likely used the walk for astronomical observations – in addition to the yard – but the walk is also protected as part of the preservation easement on the House. Walks – NOT and NEVER called widow’s walks – were used for preventing and putting out chimney fire and roof fires. In a place where wood was expensive and had to be brought from “the main” these were purely utilitarian. What good Quaker (or non-Quaker) would build a platform for his wife to stare out to the harbor to see if her husband was on his way home? The other issue is that the walk was completely resting on the ridge board – and actually was notched to accept the pitch and tip of the ridge board so they couldn’t work around it. I suspect this may have been the ways walks were once built – and also a crafty and smart thinking carpenter who came up with the idea. It makes the walk lower. But between that issue and the age of the walk and then the blizzard of February 2026 that packed gusts over 83 MPH (that’s Category 1 hurricane winds) the walk gave in. Balusters had been knocked out and the railings were loose and pulling away from the posts. So, we will also be working with Barber and Sons to create a new roofwalk – and they agreed to do this for us quickly which is also no small feat given how busy everyone is these days. So from the bottom of the Mitchell House’s heart (and mine) a big thank you to Chris Lydon and Lydon and Sons and crew, Barber and Sons / Beau and Nate Barber, the Community Preservation Committee, and Nantucket Preservation Trust (our easement holder)! JNLF
April 1, 2026
“If you don’t look, you don’t see. You have to go and look.” -Edith Andrews
Show More