Vestal Street Update

Jascin N. Leonardo Finger • Sep 19, 2016

Been a busy summer on so many fronts and boy, am I tired! Lots still to do though. Museums may close up but that doesn’t mean we stop working on any of our many fronts!


Hinchman House is now nice and sparkly with a brand new paint job thanks to Jim Tyler and his wonderful crew! After they finished Hinchman, they returned a few weeks later and painted the trim, sash, basement foundation, and the chimney at the Astronomer’s Cottage! I made a visit to the Historic District Commission for permission on a new front door at the Astronomer’s Cottage as well. The current one is circa 1965 or so and our neighbors very nicely donated a much older door they had in their basement. Thus, fairly soon, we will have a new door on the Astronomer’s Cottage at Number 3 Vestal that is not rotting away! The Astronomer’s Cottage is ca. 1830 and from some of the images I took of the window trim and sash, you can certainly see that.



Next up, shingling and re-roofing the Astronomer’s Cottage and repairing and replacing gutters and downspouts at Hinchman House. Much of this work on the two properties is being funded in part by a matching grant from the Massachusetts Cultural Facilities Fund (MCF) grant. It is a 1:1 match and we are still wrapping up that match amount should you wish to make a contribution. MCF provided $117,000.00 and MMA has to match the remainder.

More still to come – including work on the Research Center and a site visit by the structural engineer whom I have worked with for many years. He will be here to begin an assessment on the 1908 Vestal Street Observatory and 1922 Astronomical Study (the brick parapet addition) which will be another conservation project in the MMA’s future.


JNLF

Recent Posts

22 Apr, 2024
Yes. Well, almost. After about a month of working – and some living (staff and or neighbors) – on Vestal Street with all the sewer and water replacement work, the paving happened today (April 17, 2024). This is the first “layer” – a three-inch binder coat. In the fall, once time has passed, they will return for the final one inch of the finish layer. Some of the other things along Vestal Street will also be repaired and updated between now and the final coat – and a bit after that. But we are very happy, after all these years to have a modern system of piping – and all new drainage we never had before! While the curator in me loved the old clay pipes, they were riddled with roots from the trees, holes, and in some places, collapsed, and the twelve inches of asphalt had to go. Vestal Street was only paved in about 1946/1948 – and has not been paved in maybe twenty years so that is a lot of asphalt in about fifty years! And with climate change and the increase in how much rain we get in these heavy rain events, all that water rushed down Vestal Street with nowhere to go – except our cellars. I am sure the neighbors are happy too! A thank you to the Town of Nantucket’s Sewer Department, especially David Gray (who may regret giving me his cellphone number forever), N&M Excavating and Utilities (Dean, we appreciate you being so nice when we had too many questions), Victor-Brandon Corp for paving, and numerous others. We are looking forward to great flushing, powerful hose lines, and rainwater being whisked away via the new, never-before-had storm drains! JNLF And to all the N&M workers who wondered why I was constantly looking down as I walked along Vestal Street, you should see the trove of porcelain shards, glass, old nails, a bottle neck, 19 th century spoon, and even possibly a Wampanoag stone tool I found!
By Jascin N. Leonardo Finger 08 Apr, 2024
Vestal Street has seen a bevy of activity of late. In January, we began the renovation of the Maria Mitchell Vestal Street Observatory’s (MMO) Seminar Room addition – as it has been referred to since it was built in 1987. When it was created, the point was for it to serve as meeting, lecture, work space on three floors for the Astronomy Department – in particular the National Science Foundation Research Experiences for Undergraduate (NSF REU) interns we have each summer, visiting astronomers, and the astronomy staff. Believe it or not, it was the first time the Observatory had a bathroom! And, it connected to what we refer to as the Astronomer’s Cottage (ca. 1830 and purchased for the MMA in 1922) so that staff could move between the house and the Observatory without going outside – convenient! With a gift from board member and Mitchell family descendant, Richard Wolfe, we have been able to renovate this space, bringing it up to date and adding HVAC, an accessible bathroom and kitchenette, three office spaces, a seminar/meeting area, and space for intern workspaces. Lighting and interiors are being improved as this is written and we hope to have the space ready by June 1, 2024. A special thank you goes to John Wise, another Board member, who has been working with the MMA to make sure this renovation happens in a short timeframe. The work here dovetails nicely with the conservation of the historic observatory to which the Seminar Room is connected. The historic MMO, built in 1908 with a 1922 addition, has seen exterior conservation work over the last several years with support from the Community Preservation Act and the M. S. Worthington Foundation. This fall, we will move inside with more grant funding which will allow us to conserve the historic interiors and install a proper HVAC system to protect the historic fabric and historic astronomical equipment and papers. We will restore the floor in the Astronomical Study from 1922 – it’s hidden under wall-to-wall carpet and 1950s tile but it’s still there – and allow us to conserved the historic plaster and all of the original varnished woodwork. Stay tuned on this project. JNLF
01 Apr, 2024
“If you don’t look, you don’t see. You have to go and look.” -Edith Andrews
Show More
Share by: